Ship Repair · Tanjung Priok

Container feeder — hull & ballast tank refit

Steel renewal, coating, and tank cleaning executed alongside within 11 days without disrupting the operator's rotation.

Machinery · Balikpapan

Main engine top overhaul — 4-stroke medium speed

Cylinder head, liner, and injector work on a 6-cyl trunk engine — parts sourced, workshopped, and re-installed to spec.

Spares Supply · Nationwide

Fleet spares package — 12-vessel Indonesian operator

Consolidated critical-spares inventory built and dispatched under a single frame agreement, cutting reorder lead time by 40%.

Marine Consultancy · Coastal Indonesia

Pre-drydock scoping — coastal tanker

Independent condition assessment, repair specification, and owner's-rep attendance during a 22-day drydock rotation.

Safety & Compliance · Tanjung Perak

Life-saving appliance overhaul — 3-ship domestic fleet

Liferaft servicing, fire-system testing, and SOLAS certification renewal completed within a single port call cycle.

Damage Repair · Makassar

Stern tube seal & propeller shaft alignment

Emergency alongside repair with parts flown in and installed inside a 96-hour window; vessel released back to trade.